This OCR scan may contain automatically generated text as generated using Apache Tika and Tesseract. It may not be correct. No effort has been made to correct any of these scans (so far). These OCR scans are also used in the site's Search feature. Please review the Search Policy for details about the site features. The OCR scan is provided here for reference purposes. It provides searchable text when the underlying document might not. But the scan process may not always work perfectly.
COMMONWEALTH OF VIRGINIA DEPARTMENT OF MINES, MINERALS AND ENERGY
DIVISION OF MINED LAND RECLAMATION P.O. DRAWER 900, BIG STONE GAP, VA 24219
TELEPHONE: (276) 523-8198
ABANDONED MINE LAND INSPECTION
DMLR-AML-130S Printed: 03/29/19 5/06 Page 1 of 2
HNM0008582
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
Golden Pond Gob Removal 18302 2018 HNM0008582
CONTRACT INFORMATION
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
C196013 03/31/21 2
CONTRACTOR NAME ENGINEER NAME
Russell County Reclamation, LLC SCOTTY COX
SITE CONTACT PERSON: Kevin Large
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
03/07/19 03/21/19 03/28/19
01:00 PM 10:00 AM 02:30 PM
02:00 PM 11:00 AM 04:00 PM
WET DRY DRY
INSPECTION BY ATTACHMENTS
MCDONALD-TAYLOR, H.
COMMENTS
3/7/19-The company was still working to drain the structure. A sample was collected at outfall 002 on permit 1302253 for lab analysis to ensure compliance with the NPDES permit. The total suspended solids in the sample were 13.6 mg/l, the iron concentration was 0.491 mg/l and the manganese concentration was 0.065 mg/l. All parameters were in compliance with the NPDES permit approved for permit 1302253.
3/21/19-Excavation of the material within the structure had commenced. The company was removing the top 18 inches of refuse from the outer edge of the structure. The company estimated the moisture content of the refuse to be around 18%.
The material had a dry, powdery feel and should not create any issue with haulage.3/28/19-Excavation of material continues, with the company still excavating the upper 18 inches. The water discharging from Golden Pond was much less than in previous weeks. The discharge was estimated to be less than 1 gallon per minute and was clear. Photos of the site are shown below.
Dm
-ginia Depai Mines Minerals and Energy
COMMONWEALTH OF VIRGINIA
HNM0008582
DEPARTMENT OF MINES, MINERALS AND ENERGY
DIVISION OF MINED LAND RECLAMA’
TION
P.O. DRAWER 900, BIG STONE GAP, VA 24219
‘TELEPHONE: (276) 523-8198
ABANDONED MINE LAND INSPECTION PROJECT NAME PROJECT NO. GRANT YEAR | REPORT NUMBER Golden Pond Gob Removal 18302 2018 HINM0008582 CONTRACT INFORMATION CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED 196013 03/31/21 2 CONTRACTOR NAME ENGINEER NAME Russell County Reclamation, LLC SCOTTY COX SITE CONTACT PERSON: Kevin Large INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION 03/07/19 01:00 PM 02:00 PM WET 03/21/19 10:00 AM 11:00 AM DRY 03/28/19 02:30 PM 04:00 PM DRY INSPECTION BY ‘ATTACHMENTS MCDONALD-TAYLOR, H. [ COMMENTS ]
3/7/19-The company was still working to drain the structure. A sample was collected at outfall 002 on permit 1302253 for lab analysis to ensure compliance with the NPDES permit. The total suspended solids in the sample were 13.6 mgil, the iron concentration was 0.491 mg/l and the manganese concentration was 0.065 mg/l. All parameters were in compliance with the NPDES permit approved for permit 1302253.
3/21/19-Excavation of the material within the structure had commenced. The company was removing the top 18 inches of refuse from the outer edge of the structure. The company estimated the moisture content of the refuse to be around 18%. The material had a dry, powdery feel and should not create any issue with haulage.
3/28/19-Excavation of material continues, with the company stil excavating the upper 18 inches. The water discharging from Golden Pond was much less than in previous weeks. The discharge was estimated to be less than 1 gallon per minute and was clear. Photos of the site are shown below.
DMLR-AML-130S 5/06
Page 1 of 2
Printed: 03/29/19
COMMONWEALTH OF VIRGINIA DEPARTMENT OF MINES, MINERALS AND ENERGY
DIVISION OF MINED LAND RECLAMATION P.O. DRAWER 900, BIG STONE GAP, VA 24219
TELEPHONE: (276) 523-8198
ABANDONED MINE LAND INSPECTION
DMLR-AML-130S Printed: 03/29/19 5/06 Page 2 of 2
HNM0008582
COMMONWEALTH OF VIRGINIA HNM0008582
DEPARTMENT OF MINES, MINERALS AND ENERGY Dh DIVISION OF MINED LAND RECLAMATION
P.O. DRAWER 900, BIG STONE GAP, VA 24219 Virginia Depay TELEPHONE: (276) 523-8198
Mines Minerals and Energy
ABANDONED MINE LAND INSPECTION
DMLR-AML-130S Printed: 03/29/19 5/06 Page 2 of 2